[prev in list] [next in list] [prev in thread] [next in thread]
List: zaurus-general
Subject: [Zaurus-general] Zaurus & Steltor Corporate Time?
From: Rick Coloccia <coloccia () geneseo ! edu>
Date: 2003-06-23 21:24:21
[Download RAW message or body]
Hi Everyone-
I'm trying to sync my Z (SL-5600) with my to-do list and calendar.
My site uses Steltor's corporate time (recently acquired by Oracle).
I tried installing the intellisync application from the Zaurus CD and the
oracle-to-corporate-time connector, so that I could make the Z talk to
oracle, which talks to Corporate time, and then everything's sync'd.
This doesn't work.
When I run Sync Options on my XP-Pro desktop pc, I get the option of
selecting MS Outlook.
So, for example, for Todo List, I select MS Outlook, click OK, and an error
message comes up:
"The file or database name associated with Microsoft Outlook is missing,
invalid, or points to a file of zero length. Use the Browse button to
locate the file or database you wish to use with this application."
Well, I suspect this happens because I'm not using straight Outlook, I have
the corporate time to outlook connector installed.
Anyhow, I click on the browse button and no windows ever come up. It just
pauses for a second, and then hands me back a mouse pointer with no new window.
So, I ask, is anyone out there syncing their Z with Corporate Time?
If so, how?
Does anyone have any suggestions for me? I've been beating on this for a
few hours now, and it doesn't look optimistic.
Thanks!
-Rick
--
Rick Coloccia
Network Analyst
SUNY Geneseo
119 South Hall
1 College Circle
Geneseo, NY 14454
Voice: (585) 245-5577
Fax:(585) 245-5579
_______________________________________________
Zaurus-general mailing list
Zaurus-general@lists.zaurus.com
http://lists.zaurus.com/mailman/listinfo/zaurus-general
[prev in list] [next in list] [prev in thread] [next in thread]
Configure |
About |
News |
Add a list |
Sponsored by KoreLogic